Xuji Industrial Park, Liangshan, Shandong +86 159 5471 6367 sales@qingrunmachinery.com
Technical selection/Storage Tank & Heat Exchange Equipment Selection Guide
Tanks & Heat Exchange Selection Guide

Storage Tank & Heat Exchange Equipment Selection Guide

Tank material and volume selection, exchanger type and heat transfer area calculation — a scientific approach to specifying auxiliary equipment.

Tank types and selection

TypeMaterialUse casesSelection advice
Vertical tankStainless steel/carbon steel/glass-linedBulk liquid storageSize by volume stored, with 10% headroom
Horizontal tankStainless steel/carbon steelRequires supports or burialConfirm support type and load capacity
Mixing tankStainless steel/glass-linedRequires mixing or blendingConfirm agitator speed and power
Insulated tankStainless steel/carbon steelRequires temperature maintenanceConfirm insulation and heating method
316L tank316L austenitic stainless steelHigh cleanliness requirementPharma, bioprocessing, food

Heat exchanger type comparison

TypeStructureHeat transfer efficiencyUse casesFeatures
Shell & Tube CondenserTube bundle + shellMediumSteam condensation, process coolingWide application, high pressure rating
Spiral Plate ExchangerTwo plates rolledHighLiquid-liquid heat transferCompact, efficient, resists clogging
Plate Heat ExchangerCorrugated plates stackedVery highLiquid-liquid/gas-liquidEasy to dismantle and clean, highest efficiency
Volumetric heat exchangerTank + heat exchange tubesMediumDomestic hot water/heatingHas storage, suits fluctuating loads
U-tube heat exchangerU-tube bundleMediumHigh-temperature high-pressure dutyWithstands high temperature and pressure, thermal expansion

Selection checklist

Selection confirmation

  • 1.Confirm product corrosivity and choose the matching material
  • 2.Confirm working temperature range and insulation
  • 3.Confirm storage volume requirement and select a suitable capacity
  • 4.Check tank weld quality; request NDT reports
  • 5.Check manway, nozzle and valve integrity
  • 6.Check agitator bearings and seals
  • 7.Power up and test-run to confirm the agitator motor runs correctly

Equipment condition check

  • - Request a powered test-run video or an on-site trial run
  • - Inspect wear of main components and operating condition
  • - Confirm all documentation and conformity certificates are complete

Need technical support?

Our technical team is ready to answer your selection questions

Get Quote